Project

General

Profile

Actions

Bug #13240

closed

User is forced to pick an NPt destination IPv6 prefix length even when choosing a drop-down entry which contains a defined prefix length

Added by Jim Pingle almost 2 years ago. Updated 9 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
Rules / NAT
Target version:
Start date:
Due date:
% Done:

100%

Estimated time:
Plus Target Version:
23.01
Release Notes:
Default
Affected Version:
2.7.0
Affected Architecture:

Description

Following on from #4881

There are two minor issues in the NPt GUI when dealing with dynamic choices:

1. When there are multiple available entries the list isn't cleared and each line also contains the network of the previous line.

2. When picking a prefix entry from the drop-down the user is also forced to pick a matching prefix length even though the description in the drop-down lists the correct prefix length already. It should skip that check when choosing an entry from the list.


Related issues

Related to Feature #4881: Allow NPt to use dynamic IPv6 networksResolvedViktor Gurov07/25/2015

Actions
Related to Bug #13310: Each line in the NPt destination IPv6 prefix list also contains the network of the previous line when multiple choices are presentResolvedJim Pingle

Actions
Actions #1

Updated by Jim Pingle almost 2 years ago

  • Related to Feature #4881: Allow NPt to use dynamic IPv6 networks added
Actions #2

Updated by Jim Pingle almost 2 years ago

  • Description updated (diff)
Actions #3

Updated by Jim Pingle over 1 year ago

  • Related to Bug #13310: Each line in the NPt destination IPv6 prefix list also contains the network of the previous line when multiple choices are present added
Actions #4

Updated by Jim Pingle over 1 year ago

  • Subject changed from Dynamic NPt entry UI has a couple quirks to User is forced to pick an NPt destination IPv6 prefix length even when choosing a drop-down entry which contains a defined prefix length
  • Assignee set to Jim Pingle

Moving first point to #13310 - keeping this one for point 2.

Actions #5

Updated by Jim Pingle over 1 year ago

  • Plus Target Version changed from 22.09 to 22.11
Actions #6

Updated by Jim Pingle over 1 year ago

  • Plus Target Version changed from 22.11 to 23.01
Actions #7

Updated by Jim Pingle over 1 year ago

  • Status changed from New to In Progress
Actions #8

Updated by Jim Pingle over 1 year ago

  • Status changed from In Progress to Feedback
  • % Done changed from 0 to 100
Actions #9

Updated by Jim Pingle over 1 year ago

  • Status changed from Feedback to Resolved

Working correctly on current snap

Actions #10

Updated by Jim Pingle 9 months ago

  • Affected Version set to 2.7.0
Actions

Also available in: Atom PDF