Project

General

Profile

Actions

Feature #3261

closed

RRD Graph Change

Added by Craig Duff over 11 years ago. Updated over 9 years ago.

Status:
Needs Patch
Priority:
Normal
Assignee:
-
Category:
RRD Graphs
Target version:
-
Start date:
10/10/2013
Due date:
% Done:

0%

Estimated time:
Plus Target Version:
Release Notes:

Description

Would it be possible to have the feature to allow a change from the 95th Percentile to whatever value we like. I.E 90th Percentile instead. I am taking out a new contract with a datecentre and they measure bandwidth based on the 90th rather than 95th.

Actions #1

Updated by Chris Buechler over 9 years ago

  • Tracker changed from Todo to Feature
  • Project changed from pfSense Packages to pfSense
  • Category set to RRD Graphs
  • Status changed from New to Needs Patch
Actions

Also available in: Atom PDF