Project

General

Profile

« Previous | Next » 

Revision 49825b17

Added by Jim Pingle about 14 years ago

If the rrd multiplier is negative, use 5% for out instead of 95% for the 95th percentile line.

  • added
  • modified
  • copied
  • renamed
  • deleted