Project

General

Profile

Actions

New Content #11071

closed

Add documentation for missing configuration items on IPv6 Router Advertisements

Added by Marcos M over 3 years ago. Updated about 1 year ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
DHCP
Target version:
-
Start date:
Due date:
% Done:

100%

Estimated time:

Description

Page: https://docs.netgate.com/pfsense/en/latest/services/dhcp/ipv6-ra.html

Feedback:

Include description for all fields e.g.: Router lifetime, and Minimum/Maximum RA interval.

Actions #1

Updated by Jim Pingle over 3 years ago

  • Category set to DHCP
Actions #2

Updated by Marcos M over 3 years ago

Suggestion would be:

Minimum & Maximum RA interval
The router sends router advertisements on each interface configured to transmit messages. The advertisements include route information and indicate to network hosts that the router is operational. The router sends these unsolicited multicast router advertisements periodically, with a time range defined by minimum and maximum values in seconds. The maximum interval for sending RA messages should be less than or equal to the router lifetime in RA messages.

Router lifetime
The lifetime associated with the default router in seconds. A value of 0 indicates that the router is not a default router and that associated default routes should be discarded. The default is 3 * Maximim RA interval seconds.

Actions #3

Updated by Jim Pingle over 3 years ago

  • Tracker changed from Documentation to New Content
Actions #4

Updated by Jim Pingle over 1 year ago

  • Subject changed from Feedback on Services — IPv6 Router Advertisements to Add documentation for missing configuration items on IPv6 Router Advertisements
Actions #5

Updated by Chris W over 1 year ago

  • % Done changed from 0 to 90
Actions #6

Updated by Chris W over 1 year ago

  • Status changed from New to Feedback
Actions #7

Updated by Jim Pingle over 1 year ago

  • Status changed from Feedback to Pull Request Review
Actions #8

Updated by Jim Pingle over 1 year ago

  • Status changed from Pull Request Review to Feedback
  • Start date deleted (11/14/2020)
Actions #9

Updated by Jim Pingle about 1 year ago

  • Status changed from Feedback to Resolved
  • % Done changed from 90 to 100
Actions

Also available in: Atom PDF