Actions
Feature #15532
openUpdate NUT status widget
Status:
New
Priority:
Normal
Assignee:
-
Category:
Nut
Target version:
-
Start date:
Due date:
% Done:
0%
Estimated time:
Plus Target Version:
Description
Update usability of the NUT status widget as follows:
- Add color coded icon for Summary status.
- Add line voltage values to Load line if available.
- Add battery voltage to Battery line if available.
- Add battery install date to Battery line if available.
- Add Last test date/result (new line) if available.
Actions